Request a Quote 0

UBM

Balance Control Unit

AvailabilityPre-order
Availability
Pre-order
Condition
New
Warranty
6 Months
Price on request

Price and lead time are confirmed before payment.

Description

UBM Electrical-balance and zero-control unit

UBM is a electrical-balance and zero-control unit used in the KURS MP-2 navigation-landing system. Checks and aligns the electrical zero of SP-50 channel phase detectors with the zero position of the connected indication instruments. It is an individual functional unit rather than a complete KURS MP-2 equipment set.

Ordering must be based on the complete UBM marking and aircraft documentation. A similar housing, connector arrangement or partial designation does not establish interchangeability with another version.

Full descriptionCollapse description

Function in the KURS MP-2 system

Checks and aligns the electrical zero of SP-50 channel phase detectors with the zero position of the connected indication instruments. Common adjustment and test unit shared by both KURS MP-2 half-sets. Serviceability is evaluated in the installed signal chain, including power, antenna feeders, inputs, outputs and connected indications.

Exact electrical tolerances, test points and adjustment procedures must be taken from the product passport and approved maintenance documentation. Applying power or connecting a unit by analogy with a similar model can damage the equipment and produce misleading test results.

Interaction with related units

The closest functional connections for UBM are KRP-200P, GRP-20PM and IKU-1A. Each unit performs a separate task. Their presentation as related products identifies a shared system context and does not mean that they are substitutes for one another.

Before replacement, technicians compare the markings of all connected units, connector pinning, monoblock configuration and the wiring diagram for the particular aircraft. A replacement unit may be supplied without cables, shock mount, mating connectors or other installation accessories.

Installation and aircraft context

One common unit per complete KURS MP-2 installation. KURS MP-2 installations are documented on the Antonov An-26 and Ilyushin Il-76. Application of UBM to another aircraft type, series or modification must be confirmed against its equipment list and approved technical documentation.

Incoming inspection normally includes verification of the data plate and examination of the housing, connectors, mounting points and seals. Functional testing and adjustment require the approved procedure and suitable test equipment; appearance alone cannot confirm serviceability.

Identification and ordering UBM

An enquiry should state the complete designation, quantity, required condition, delivery scope and required documentation. A clear data-plate photograph and details of the removed unit help distinguish versions and avoid selection from an abbreviated name. Other system components are listed in Electronic Control Units.

Technical details

Product Type
Electrical-balance and zero-control unit
Part Number
UBM
Alternative Designations
UBM; UBM balance unit; SP-50 balance unit
System
KURS MP-2
Function
Checks and aligns the electrical zero of SP-50 channel phase detectors with the zero position of the connected indication instruments.
All specificationsCollapse specifications
System Position
Common adjustment and test unit shared by both KURS MP-2 half-sets.
Installation Quantity
One common unit per complete KURS MP-2 installation.
Confirmed Aircraft Context
Antonov An-26 and Ilyushin Il-76 installations equipped with KURS MP-2
Related Units
KRP-200P; GRP-20PM; IKU-1A
Compatibility Check
Against the product passport, aircraft equipment list and wiring diagram for the specific installation
Documentation
Product passport, technical description, operating instructions and aircraft wiring documentation

Payment & delivery

Orders ship from our hub in Dubai. Partner stock is first transferred to Dubai, then shipped to you.

Dubai stock: 100% before dispatch. Partner stock (Remote stock) and Pre-order: 50% advance payment to start the order and 50% before shipment from Dubai to you.

Availability, lead time, delivery cost and payment terms are confirmed for your order before payment.

Payment & delivery terms

Questions about this part?

Send your requirements — we’ll clarify the details for your order.

Share this part

UBM