mounting frame
Price on request
mounting frame
Available on back-order
RM-355G is an aircraft mounting and damping frame designed for installation, vibration isolation, and electrical integration of BRN120T5A-3C and BZUNP355G units. The frame is used in aircraft systems operating with three-phase alternating current power generation.
The RM-355G frame provides mechanical support and depreciation for installed units, ensuring reliable operation under vibration and dynamic loads typical for aircraft environments. In addition to mechanical fixation, the frame enables electrical installation and connection of the units within the aircraft power generation system.
RM-355G supports operation with direct current and multiple three-phase alternating current power supplies at different frequencies, allowing integration into aircraft electrical systems with 400 Hz and 800 Hz AC networks. The frame is designed for use as part of onboard power generation and distribution systems.
The frame is supplied as an aircraft equipment component and is intended for installation according to the aircraft electrical system configuration and technical documentation.
Purpose: Depreciation, installation, and electrical mounting of BRN120T5A-3C and BZUNP355G units
Systems: Aircraft three-phase AC power generation system
Application: Aircraft electrical power generation and distribution systems
Product Type: Aircraft mounting and damping frame
Compatible Units: BRN120T5A-3C, BZUNP355G
DC Supply Voltage: 24 to 29.4 V
AC Supply Voltage (3-phase, 400 Hz): 115 to 119 V (per phase)
AC Supply Voltage (3-phase, 800 Hz): 17 to 30 V (per phase)
Weight: Not more than 2.5 kg
Dimensions: 467 × 134 × 262 mm
Condition: As applicable
Documentation: Manufacturer passport and technical documentation available upon request
All shipments are carried out from our international warehouse in Dubai (UAE), as well as from our partners’ remote warehouses.
In Stock — items available in stock at the Dubai warehouse are dispatched within 5–10 business days after receiving 100% prepayment.
Remote Stock — items available at our partners’ remote warehouses are supplied within an average of 30–45 business days after receiving 100% prepayment.
Pre-Order — made-to-order products are manufactured and delivered within an average of 45–60 business days. Payment terms: 50% advance payment to start production, with the remaining 50% paid before dispatch from the Dubai warehouse after full readiness for shipment.
Returns & Changes (Restocking Fee)
For selected items, a RESTOCKING FEE of 10% may apply in case of return, order cancellation, or changes to the order specifications. This condition applies only to certain products and is confirmed at the order approval stage.
Warranty
All products are covered by a standard 6-month warranty.
Extended warranty is available upon request and is agreed individually; it may affect the final product price.
RM-355G is an aircraft mounting and damping frame designed for installation, vibration isolation, and electrical integration of BRN120T5A-3C and BZUNP355G units. The frame is used in aircraft systems operating with three-phase alternating current power generation.
The RM-355G frame provides mechanical support and depreciation for installed units, ensuring reliable operation under vibration and dynamic loads typical for aircraft environments. In addition to mechanical fixation, the frame enables electrical installation and connection of the units within the aircraft power generation system.
RM-355G supports operation with direct current and multiple three-phase alternating current power supplies at different frequencies, allowing integration into aircraft electrical systems with 400 Hz and 800 Hz AC networks. The frame is designed for use as part of onboard power generation and distribution systems.
The frame is supplied as an aircraft equipment component and is intended for installation according to the aircraft electrical system configuration and technical documentation.
Purpose: Depreciation, installation, and electrical mounting of BRN120T5A-3C and BZUNP355G units
Systems: Aircraft three-phase AC power generation system
Application: Aircraft electrical power generation and distribution systems
Product Type: Aircraft mounting and damping frame
Compatible Units: BRN120T5A-3C, BZUNP355G
DC Supply Voltage: 24 to 29.4 V
AC Supply Voltage (3-phase, 400 Hz): 115 to 119 V (per phase)
AC Supply Voltage (3-phase, 800 Hz): 17 to 30 V (per phase)
Weight: Not more than 2.5 kg
Dimensions: 467 × 134 × 262 mm
Condition: As applicable
Documentation: Manufacturer passport and technical documentation available upon request
All shipments are carried out from our international warehouse in Dubai (UAE), as well as from our partners’ remote warehouses.
In Stock — items available in stock at the Dubai warehouse are dispatched within 5–10 business days after receiving 100% prepayment.
Remote Stock — items available at our partners’ remote warehouses are supplied within an average of 30–45 business days after receiving 100% prepayment.
Pre-Order — made-to-order products are manufactured and delivered within an average of 45–60 business days. Payment terms: 50% advance payment to start production, with the remaining 50% paid before dispatch from the Dubai warehouse after full readiness for shipment.
Returns & Changes (Restocking Fee)
For selected items, a RESTOCKING FEE of 10% may apply in case of return, order cancellation, or changes to the order specifications. This condition applies only to certain products and is confirmed at the order approval stage.
Warranty
All products are covered by a standard 6-month warranty.
Extended warranty is available upon request and is agreed individually; it may affect the final product price.