RM-355G Mounting Frame for BRN120T5A-3C
×

Login by Email

Custom order 0
Back to catalog
PRE-ORDER
PRE-ORDER

mounting frame

RM-355G ( RM355G)

Warranty:6 Months
Condition:New
Applicable To:BRN120T5A-3C, BZUNP355G
Price on request
Price on request

Description

Mounting frame RM-355G for aircraft power equipment

RM-355G is an aircraft mounting and damping frame used for installation of BRN120T5A-3C and BZUNP355G units. It is not an electrical generator or converter by itself. The frame gives the mounted equipment a fixed installation base and connects it into the aircraft electrical system according to the wiring layout. In practical use, it works as part of the installation set for onboard three-phase AC power generation equipment.

RM-355G damping and installation function

The main task of RM-355G is to hold the installed units and reduce the effect of vibration and dynamic loads. Aircraft electrical equipment often works in areas where vibration, shock and temperature changes affect connectors, fasteners and internal elements. The frame helps keep the units in the correct position and supports normal mechanical alignment. For maintenance, the condition of the frame, mounting points, damping elements and electrical contacts should be checked together.

Electrical integration through RM-355G

RM-355G also provides electrical mounting for the connected units. It supports circuits with DC supply and three-phase AC supply used in aircraft power generation systems. The frame is intended for use in systems where 400 Hz and 800 Hz AC networks may be present. Because the frame is linked to power generation and distribution equipment, replacement should be checked against the aircraft electrical diagram, not only by the part marking.

RM-355G with BRN120T5A-3C and BZUNP355G units

The frame is specified for installation with BRN120T5A-3C and BZUNP355G units. These units are part of the aircraft electrical power generation chain, so the RM-355G frame belongs to the same system group. It may be installed in an electrical equipment bay or another aircraft location defined by the airframe documentation. A frame removed from one aircraft should not be treated as universal until the mounting holes, connector layout and installed equipment version are confirmed.

Identification and ordering of RM-355G

Before ordering RM-355G, the marking should be compared with the aircraft parts catalog, power system documentation or the passport of the installed equipment. It is useful to provide the aircraft type, installed BRN120T5A-3C or BZUNP355G unit marking, and a photo of the frame or data plate. The product is also known under alternative designations RM-355G and РМ-355Г.

Details

Product Type: Aircraft mounting and damping frame
Function: Damping, installation, and electrical mounting of BRN120T5A-3C and BZUNP355G units
Application / Where Used: Aircraft electrical power generation and distribution systems
System / Installation Area: Aircraft three-phase AC power generation system
Compatible Equipment: BRN120T5A-3C, BZUNP355G
DC Supply Voltage: 24 to 29.4 V
AC Supply Voltage: 115 to 119 V per phase, three-phase 400 Hz
AC Supply Voltage: 17 to 30 V per phase, three-phase 800 Hz
Dimensions: 467 × 134 × 262 mm
Weight: Not more than 2.5 kg
Condition: As applicable
Technical Documentation: Manufacturer passport and technical documentation available upon request

Payment & delivery

All shipments are carried out from our international warehouse in Dubai (UAE), as well as from our partners’ remote warehouses.

In Stock — items available in stock at the Dubai warehouse are dispatched within 5–10 business days after receiving 100% prepayment.

Remote Stock — items available at our partners’ remote warehouses are supplied within an average of 30–45 business days after receiving 100% prepayment.

Pre-Order — made-to-order products are manufactured and delivered within an average of 45–60 business days. Payment terms: 50% advance payment to start production, with the remaining 50% paid before dispatch from the Dubai warehouse after full readiness for shipment.

Returns & Changes (Restocking Fee)
For selected items, a RESTOCKING FEE of 10% may apply in case of return, order cancellation, or changes to the order specifications. This condition applies only to certain products and is confirmed at the order approval stage.

Warranty
All products are covered by a standard 6-month warranty.
Extended warranty is available upon request and is agreed individually; it may affect the final product price.

  • Description
  • Details
  • Payment & delivery

Mounting frame RM-355G for aircraft power equipment

RM-355G is an aircraft mounting and damping frame used for installation of BRN120T5A-3C and BZUNP355G units. It is not an electrical generator or converter by itself. The frame gives the mounted equipment a fixed installation base and connects it into the aircraft electrical system according to the wiring layout. In practical use, it works as part of the installation set for onboard three-phase AC power generation equipment.

RM-355G damping and installation function

The main task of RM-355G is to hold the installed units and reduce the effect of vibration and dynamic loads. Aircraft electrical equipment often works in areas where vibration, shock and temperature changes affect connectors, fasteners and internal elements. The frame helps keep the units in the correct position and supports normal mechanical alignment. For maintenance, the condition of the frame, mounting points, damping elements and electrical contacts should be checked together.

Electrical integration through RM-355G

RM-355G also provides electrical mounting for the connected units. It supports circuits with DC supply and three-phase AC supply used in aircraft power generation systems. The frame is intended for use in systems where 400 Hz and 800 Hz AC networks may be present. Because the frame is linked to power generation and distribution equipment, replacement should be checked against the aircraft electrical diagram, not only by the part marking.

RM-355G with BRN120T5A-3C and BZUNP355G units

The frame is specified for installation with BRN120T5A-3C and BZUNP355G units. These units are part of the aircraft electrical power generation chain, so the RM-355G frame belongs to the same system group. It may be installed in an electrical equipment bay or another aircraft location defined by the airframe documentation. A frame removed from one aircraft should not be treated as universal until the mounting holes, connector layout and installed equipment version are confirmed.

Identification and ordering of RM-355G

Before ordering RM-355G, the marking should be compared with the aircraft parts catalog, power system documentation or the passport of the installed equipment. It is useful to provide the aircraft type, installed BRN120T5A-3C or BZUNP355G unit marking, and a photo of the frame or data plate. The product is also known under alternative designations RM-355G and РМ-355Г.

Product Type: Aircraft mounting and damping frame
Function: Damping, installation, and electrical mounting of BRN120T5A-3C and BZUNP355G units
Application / Where Used: Aircraft electrical power generation and distribution systems
System / Installation Area: Aircraft three-phase AC power generation system
Compatible Equipment: BRN120T5A-3C, BZUNP355G
DC Supply Voltage: 24 to 29.4 V
AC Supply Voltage: 115 to 119 V per phase, three-phase 400 Hz
AC Supply Voltage: 17 to 30 V per phase, three-phase 800 Hz
Dimensions: 467 × 134 × 262 mm
Weight: Not more than 2.5 kg
Condition: As applicable
Technical Documentation: Manufacturer passport and technical documentation available upon request

All shipments are carried out from our international warehouse in Dubai (UAE), as well as from our partners’ remote warehouses.

In Stock — items available in stock at the Dubai warehouse are dispatched within 5–10 business days after receiving 100% prepayment.

Remote Stock — items available at our partners’ remote warehouses are supplied within an average of 30–45 business days after receiving 100% prepayment.

Pre-Order — made-to-order products are manufactured and delivered within an average of 45–60 business days. Payment terms: 50% advance payment to start production, with the remaining 50% paid before dispatch from the Dubai warehouse after full readiness for shipment.

Returns & Changes (Restocking Fee)
For selected items, a RESTOCKING FEE of 10% may apply in case of return, order cancellation, or changes to the order specifications. This condition applies only to certain products and is confirmed at the order approval stage.

Warranty
All products are covered by a standard 6-month warranty.
Extended warranty is available upon request and is agreed individually; it may affect the final product price.

Didn’t find the parts you need? Contact us — we will assist in sourcing them.

Send your request — we will provide availability, lead time, pricing, and delivery details.
Share