TV2-117 lifting beam
$1725
TV2-117 lifting beam
Available on back-order
8AT-9908-00 is a tv2-117 engine lifting beam identified through the exact designation and specialist listings. Lifting and lowering the TV2-117 engine during removal and installation on Mi-8 helicopter executions equipped with that powerplant. This page describes the specific item and does not copy specifications from equipment that merely looks similar.
The Mi-8 maintenance manual illustrates 8AT-9908-00 attached to the engine support lugs during engine removal and installation. A specialist overhaul-tool catalog gives a rated capacity of 350 kg and a mass of 3.3 kg for 8AT-9908-00. This distinction matters in search and procurement: the base number, letter index, suffix and model reference should agree with the applicable documentation or the marking on the available item.
The product is used as ground support equipment. It is not a universal tool simply because another fixture performs a comparable task. Before use, maintenance personnel should confirm the approved task card, serviceability, attachment or connection points, and the permitted aircraft or component configuration.
The confirmed TV2-117 application separates this beam from 140-9908-00 for TV3-117 and from 8MT-9904-00 for AI-9V. When a value is absent from the located documentation, it is not replaced with a calculation or a specification from a neighbouring model. This keeps the page technically accurate and allows the customer to request a passport, drawing or test record separately.
Before ordering, compare 8AT-9908-00 with the maintenance manual, ground-equipment catalog or delivery-set list. Also verify interfaces, working medium, load or pressure range, included accessories and periodic inspection requirements whenever those characteristics apply to this type of equipment.
Products linked within the same category may support the same aircraft family, but they are not substitutes. A jack, crane, trolley, valve or servicing control unit performs its own operation and must be used only in the documented configuration.
Function and attachment procedure are confirmed by the Mi-8 manual; 350 kg capacity and 3.3 kg mass are published by a specialist tool catalog and should be passport-checked. Unverified dimensions, mass, pressure, rated capacity or applicability are intentionally omitted. Where a reference value is shown, the text identifies its status and requires confirmation against the passport for the supplied unit.
Incoming inspection should check the identification marking, body and joint condition, completeness, fasteners, hoses, cables, locks and working elements as applicable. Operational readiness is established through records and the approved inspection procedure, not appearance alone.
A technical inquiry is more useful when it includes the manual or equipment-list page that names 8AT-9908-00, together with photographs of the marking and interfaces on the existing sample. This helps separate the base model from a suffix-specific execution and allows the delivery set to be agreed in advance. For lifting, pumping or pressure-control equipment, the request should also state the required current inspection or test documentation.
Before release to service, a new or stored item should pass the recipient’s approved incoming inspection. Mechanical fixtures require checks for deformation, corrosion, thread damage and locking parts. Hydraulic equipment requires confirmation of fluid compatibility, seal condition and leakage control. Valves and servicing panels require clean passages, correct connections and functional control checks. The operator’s documentation determines subsequent inspection intervals.
The card uses YOM 2026, Warranty: 6 Months and Pre-Order status. The existing WooCommerce price and stock state are preserved. A useful inquiry should include the exact designation, quantity, maintained aircraft or component, required delivery set and any need for a passport, certificate, drawing or test report.
More products are available in the Ground Support Equipment category. Internal links are provided for navigation between related maintenance items and do not claim interchangeability.
Aircraft reference: Mil Mi-8. It does not replace approved technical documentation.
Related products for category navigation: 246-9908-00, 8MT-9904-00, 246-9922-3000, 56-9907-00. They may support the same maintenance workflow but are not interchangeable.
Product Type: TV2-117 engine lifting beam
Designation: 8AT-9908-00
Alternative Designations: 8AT-9908-00; 8AT.9908.00; 8A-9908-00; TV2-117 engine lifting traverse
Function / Application: Lifting and lowering the TV2-117 engine during removal and installation on Mi-8 helicopter executions equipped with that powerplant.
Confirmed Technical Information: The Mi-8 maintenance manual illustrates 8AT-9908-00 attached to the engine support lugs during engine removal and installation. A specialist overhaul-tool catalog gives a rated capacity of 350 kg and a mass of 3.3 kg for 8AT-9908-00. The confirmed TV2-117 application separates this beam from 140-9908-00 for TV3-117 and from 8MT-9904-00 for AI-9V.
Data Verification Status: Function and attachment procedure are confirmed by the Mi-8 manual; 350 kg capacity and 3.3 kg mass are published by a specialist tool catalog and should be passport-checked.
Equipment Category: Aircraft ground support equipment
Estimated Lead Time: 90–120 days; subject to confirmation
Technical Documentation: Product passport, drawing, maintenance manual and delivery records when available
All shipments are carried out from our international warehouse in Dubai (UAE), as well as from our partners’ remote warehouses.
In Stock — items available in stock at the Dubai warehouse are dispatched within 5–10 business days after receiving 100% prepayment.
Remote Stock — items available at our partners’ remote warehouses are supplied within an average of 30–45 business days after receiving 100% prepayment.
Pre-Order — made-to-order products are manufactured and delivered within an average of 45–60 business days. Payment terms: 50% advance payment to start production, with the remaining 50% paid before dispatch from the Dubai warehouse after full readiness for shipment.
Returns & Changes (Restocking Fee)
For selected items, a RESTOCKING FEE of 10% may apply in case of return, order cancellation, or changes to the order specifications. This condition applies only to certain products and is confirmed at the order approval stage.
Warranty
All products are covered by a standard 6-month warranty.
Extended warranty is available upon request and is agreed individually; it may affect the final product price.
8AT-9908-00 is a tv2-117 engine lifting beam identified through the exact designation and specialist listings. Lifting and lowering the TV2-117 engine during removal and installation on Mi-8 helicopter executions equipped with that powerplant. This page describes the specific item and does not copy specifications from equipment that merely looks similar.
The Mi-8 maintenance manual illustrates 8AT-9908-00 attached to the engine support lugs during engine removal and installation. A specialist overhaul-tool catalog gives a rated capacity of 350 kg and a mass of 3.3 kg for 8AT-9908-00. This distinction matters in search and procurement: the base number, letter index, suffix and model reference should agree with the applicable documentation or the marking on the available item.
The product is used as ground support equipment. It is not a universal tool simply because another fixture performs a comparable task. Before use, maintenance personnel should confirm the approved task card, serviceability, attachment or connection points, and the permitted aircraft or component configuration.
The confirmed TV2-117 application separates this beam from 140-9908-00 for TV3-117 and from 8MT-9904-00 for AI-9V. When a value is absent from the located documentation, it is not replaced with a calculation or a specification from a neighbouring model. This keeps the page technically accurate and allows the customer to request a passport, drawing or test record separately.
Before ordering, compare 8AT-9908-00 with the maintenance manual, ground-equipment catalog or delivery-set list. Also verify interfaces, working medium, load or pressure range, included accessories and periodic inspection requirements whenever those characteristics apply to this type of equipment.
Products linked within the same category may support the same aircraft family, but they are not substitutes. A jack, crane, trolley, valve or servicing control unit performs its own operation and must be used only in the documented configuration.
Function and attachment procedure are confirmed by the Mi-8 manual; 350 kg capacity and 3.3 kg mass are published by a specialist tool catalog and should be passport-checked. Unverified dimensions, mass, pressure, rated capacity or applicability are intentionally omitted. Where a reference value is shown, the text identifies its status and requires confirmation against the passport for the supplied unit.
Incoming inspection should check the identification marking, body and joint condition, completeness, fasteners, hoses, cables, locks and working elements as applicable. Operational readiness is established through records and the approved inspection procedure, not appearance alone.
A technical inquiry is more useful when it includes the manual or equipment-list page that names 8AT-9908-00, together with photographs of the marking and interfaces on the existing sample. This helps separate the base model from a suffix-specific execution and allows the delivery set to be agreed in advance. For lifting, pumping or pressure-control equipment, the request should also state the required current inspection or test documentation.
Before release to service, a new or stored item should pass the recipient’s approved incoming inspection. Mechanical fixtures require checks for deformation, corrosion, thread damage and locking parts. Hydraulic equipment requires confirmation of fluid compatibility, seal condition and leakage control. Valves and servicing panels require clean passages, correct connections and functional control checks. The operator’s documentation determines subsequent inspection intervals.
The card uses YOM 2026, Warranty: 6 Months and Pre-Order status. The existing WooCommerce price and stock state are preserved. A useful inquiry should include the exact designation, quantity, maintained aircraft or component, required delivery set and any need for a passport, certificate, drawing or test report.
More products are available in the Ground Support Equipment category. Internal links are provided for navigation between related maintenance items and do not claim interchangeability.
Aircraft reference: Mil Mi-8. It does not replace approved technical documentation.
Related products for category navigation: 246-9908-00, 8MT-9904-00, 246-9922-3000, 56-9907-00. They may support the same maintenance workflow but are not interchangeable.
Product Type: TV2-117 engine lifting beam
Designation: 8AT-9908-00
Alternative Designations: 8AT-9908-00; 8AT.9908.00; 8A-9908-00; TV2-117 engine lifting traverse
Function / Application: Lifting and lowering the TV2-117 engine during removal and installation on Mi-8 helicopter executions equipped with that powerplant.
Confirmed Technical Information: The Mi-8 maintenance manual illustrates 8AT-9908-00 attached to the engine support lugs during engine removal and installation. A specialist overhaul-tool catalog gives a rated capacity of 350 kg and a mass of 3.3 kg for 8AT-9908-00. The confirmed TV2-117 application separates this beam from 140-9908-00 for TV3-117 and from 8MT-9904-00 for AI-9V.
Data Verification Status: Function and attachment procedure are confirmed by the Mi-8 manual; 350 kg capacity and 3.3 kg mass are published by a specialist tool catalog and should be passport-checked.
Equipment Category: Aircraft ground support equipment
Estimated Lead Time: 90–120 days; subject to confirmation
Technical Documentation: Product passport, drawing, maintenance manual and delivery records when available
All shipments are carried out from our international warehouse in Dubai (UAE), as well as from our partners’ remote warehouses.
In Stock — items available in stock at the Dubai warehouse are dispatched within 5–10 business days after receiving 100% prepayment.
Remote Stock — items available at our partners’ remote warehouses are supplied within an average of 30–45 business days after receiving 100% prepayment.
Pre-Order — made-to-order products are manufactured and delivered within an average of 45–60 business days. Payment terms: 50% advance payment to start production, with the remaining 50% paid before dispatch from the Dubai warehouse after full readiness for shipment.
Returns & Changes (Restocking Fee)
For selected items, a RESTOCKING FEE of 10% may apply in case of return, order cancellation, or changes to the order specifications. This condition applies only to certain products and is confirmed at the order approval stage.
Warranty
All products are covered by a standard 6-month warranty.
Extended warranty is available upon request and is agreed individually; it may affect the final product price.