140-9940-00 Engine and gearbox pipeline plug set | Aviamisto
Request a Quote 0

140-9940-00

Engine pipeline plug set

AvailabilityPre-order
Availability
Pre-order
Condition
New
Warranty
6 Months
YOM
2026
$8510

Price and lead time are confirmed before payment.

Description

140-9940-00 Engine and gearbox pipeline plug set

140-9940-00 is a engine and gearbox pipeline plug set identified through the exact designation and specialist listings. Protecting open pipelines during removal of engines and the main gearbox in the applicable Mi-8-family maintenance configuration. This page describes the specific item and does not copy specifications from equipment that merely looks similar.

Specialist listings identify 140-9940-00 as a set of blanks for pipes with engines and gearbox removed. The 140-series set is retained separately from 8AT-9940-00 because the drawing number and expected inventory are different. This distinction matters in search and procurement: the base number, letter index, suffix and model reference should agree with the applicable documentation or the marking on the available item.

Full descriptionCollapse description

Maintenance role of 140-9940-00

The product is used as ground support equipment. It is not a universal tool simply because another fixture performs a comparable task. Before use, maintenance personnel should confirm the approved task card, serviceability, attachment or connection points, and the permitted aircraft or component configuration.

Each plug, cap, case and inventory sheet should be matched to the supplied set; material and thread data are not copied from another set. When a value is absent from the located documentation, it is not replaced with a calculation or a specification from a neighbouring model. This keeps the page technically accurate and allows the customer to request a passport, drawing or test record separately.

Designation and compatibility checks

Before ordering, compare 140-9940-00 with the maintenance manual, ground-equipment catalog or delivery-set list. Also verify interfaces, working medium, load or pressure range, included accessories and periodic inspection requirements whenever those characteristics apply to this type of equipment.

Products linked within the same category may support the same aircraft family, but they are not substitutes. A jack, crane, trolley, valve or servicing control unit performs its own operation and must be used only in the documented configuration.

Confirmed and unconfirmed technical data

Product type and maintenance situation are consistently confirmed by specialist listings; detailed inventory and interfaces require the drawing. Unverified dimensions, mass, pressure, rated capacity or applicability are intentionally omitted. Where a reference value is shown, the text identifies its status and requires confirmation against the passport for the supplied unit.

Incoming inspection should check the identification marking, body and joint condition, completeness, fasteners, hoses, cables, locks and working elements as applicable. Operational readiness is established through records and the approved inspection procedure, not appearance alone.

A technical inquiry is more useful when it includes the manual or equipment-list page that names 140-9940-00, together with photographs of the marking and interfaces on the existing sample. This helps separate the base model from a suffix-specific execution and allows the delivery set to be agreed in advance. For lifting, pumping or pressure-control equipment, the request should also state the required current inspection or test documentation.

Before release to service, a new or stored item should pass the recipient’s approved incoming inspection. Mechanical fixtures require checks for deformation, corrosion, thread damage and locking parts. Hydraulic equipment requires confirmation of fluid compatibility, seal condition and leakage control. Valves and servicing panels require clean passages, correct connections and functional control checks. The operator’s documentation determines subsequent inspection intervals.

Ordering and supply of 140-9940-00

The card uses YOM 2026, Warranty: 6 Months and Pre-Order status. The existing WooCommerce price and stock state are preserved. A useful inquiry should include the exact designation, quantity, maintained aircraft or component, required delivery set and any need for a passport, certificate, drawing or test report.

More products are available in the Ground Support Equipment category. Internal links are provided for navigation between related maintenance items and do not claim interchangeability.

Aircraft reference: Mil Mi-8. It does not replace approved technical documentation.

Related products for category navigation: 24-9940-10, 8AT-9109-00, 8AT-9111-00, 8AT-9102-350. They may support the same maintenance workflow but are not interchangeable.

Technical details

Product Type
Engine and gearbox pipeline plug set
Designation
140-9940-00
Alternative Designations
140-9940-00; 140.9940.000; set of blanks for pipes; engine and gearbox plug set
Function / Application
Protecting open pipelines during removal of engines and the main gearbox in the applicable Mi-8-family maintenance configuration.
Confirmed Technical Information
Specialist listings identify 140-9940-00 as a set of blanks for pipes with engines and gearbox removed. The 140-series set is retained separately from 8AT-9940-00 because the drawing number and expected inventory are different. Each plug, cap, case and inventory sheet should be matched to the supplied set; material and thread data are not copied from another set.
All specificationsCollapse specifications
Data Verification Status
Product type and maintenance situation are consistently confirmed by specialist listings; detailed inventory and interfaces require the drawing.
Equipment Category
Aircraft ground support equipment
Estimated Lead Time
90–120 days; subject to confirmation
Technical Documentation
Product passport, drawing, maintenance manual and delivery records when available

Payment & delivery

Orders ship from our hub in Dubai. Partner stock is first transferred to Dubai, then shipped to you.

Dubai stock: 100% before dispatch. Partner stock (Remote stock) and Pre-order: 50% advance payment to start the order and 50% before shipment from Dubai to you.

Availability, lead time, delivery cost and payment terms are confirmed for your order before payment.

Payment & delivery terms

Questions about this part?

Send your requirements — we’ll clarify the details for your order.

Share this part

140-9940-00